Budget 2026
The service charge is derived from our projected budget for 2026, detailing expected management and maintenance costs. While individual charges might differ due to parking space ownership, we've presented an average cost per leaseholder for a clearer breakdown.
Total service charge per leaseholder
Spectacle Works with Parking (54 flats) = £3,137.00 / Half-Yearly Payment = £1,568.50
Spectacle Works without Parking (26 flats) = £2,930.00 / Half-Yearly Payment = £1,465.00
Barking Road (6 flats) = £2,841.00 / Half-Yearly Payment = £1,420.50
Schedule A / Flats 1-80 Spectacle Works
Leaseholders: 80 / Total Budget: £234,380.40
£612.50 — Buildings Insurance
20.9% | Total £49,000
Building cover with Covéa and includes property, liability and reinstatement to £27.3 million. Premiums reflect market-wide increases across London. To help stabilize costs, leaseholders must maintain boilers and plumbing systems, as leaks caused by unserviced systems or unresolved issues could result in individual liability for costs.
£539.40 — Water (Supply and Waste)
18.4% | Total £43,152
Across June 2019 to August 2024, water use in the development remained stable between 21 and 25 m³/day, with a long-term average of 23.4 m³/day. The most recent measured period (4 July 2025 to 20 August 2025) shows a marked spike to 29.57 m³/day, which has required an increase to the water budget. We are investigating the cause of this rise. Water costs are split across both buildings, with Spectacle Works accounting for 93 percent and Barking Road for 7 percent.
£312.50 — Management Services
10.7% | Total £25,000
Management services, Westbury Residential’s management fee for day-to-day operations, contractor coordination and compliance oversight. All spend requires RTM Director approval.
£300.00 — General Building Repairs and Works
10.2% | Total £24,000
General building repairs and works, day-to-day maintenance and reactive repairs to render, guttering, doors and communal areas so that the structure and exterior remain in repair as required by the lease.
£275.00 — Reserve Fund
9.4% | Total £22,000
Annual contribution towards major works and unexpected costs, helping avoid one-off charges, we are aiming to maintain a total reserve of around £100,000
£154.38 — Cleaning
5.3% | Total £12,350
Weekly cleaning of internal hallways and stairwells every Thursday, including sweeping, vacuuming, dusting light fittings, wiping primary and fire doors, sanitising handrails, cleaning internal glazing, skirting boards and corners, and removing cobwebs. External walkways are cleared of leaves, debris and litter each week.
£112.50 — Electricity
3.8% | Total £9,000
Communal lighting, pumps and security systems.
£63.85 — Firestopping (Flat front doors)
2.2% | Total £5,108.40
FRA-required repairs sealing door frames to prevent smoke spread and maintain fire resistance.
£62.50 — Door Entry
2.1% | Total £5,000
Servicing and repairs to intercom and access systems to maintain security.
£62.50 — Grounds Maintenance
2.1% | Total £5,000
Monthly maintenance of external planting and garden areas, including clearing rubbish around garden beds, removing overgrown vegetation attached to the building, general weeding and upkeep of shared outdoor spaces such as Augers Lane.
£62.50 — General Contingency
2.1% | Total £5,000
A yearly allowance for unplanned repairs or urgent compliance items arising throughout the year.
£50.00 — AOV and Emergency Lighting Inspections
1.7% | Total £4,000
Monthly tests and annual servicing of emergency lighting, smoke vents and dry risers, required under the Fire Safety (England) Regulations 2022 to ensure escape routes remain lit and smoke can be vented in an emergency.
£43.75 — Water Monitoring and Works
1.5% | Total £3,500
Statutory water-safety testing and maintenance required under HSE L8 and the Water Supply (Water Fittings) Regulations. This includes routine Legionella monitoring, tank cleaning and servicing of the communal booster set that supplies water to all 80 flats.
£37.70 — Communal Fire Door Inspections (quarterly)
1.3% | Total £3,016
Quarterly inspections of all communal fire doors to ensure they close correctly, provide 30-minute fire resistance and meet the requirements of the Fire Safety (England) Regulations 2022. Because the building is over 11.4 metres in height, these inspections must be carried out every three months.
£25.00 — Refuse and Bin Costs
0.9% | Total £2,000
Charges for clearing bulky or inappropriate waste left in the bin stores or car park. These costs arise when residents dump items that Newham Council will not collect from the estate. Bulky waste must be booked with Newham Council for pavement collection on Jedburgh Road, as leaving it onsite results in additional charges to all leaseholders.
£25.00 — Window Cleaning
0.9% | Total £2,000
Annual contract window clean for communal glazing across Spectacle Works and Barking Road.
£25.00 — Projects / Community works
0.9% | Total £2,000
Small planned works and minor improvements across the development, typically covering materials only.
£25.00 — AOV and Emergency Lighting Maintenance and Servicing
0.9% | Total £2,000
Repairs and remedial works arising from monthly tests, ensuring life-safety systems remain compliant and operational.
£19.00 — Front Door Inspections (annual)
0.6% | Total £1,520
Annual inspection of all flat entrance doors to ensure they continue to meet current fire-resistance standards.
£18.75 — Drain Maintenance
0.6% | Total £1,500
Routine clearing and maintenance of the drainage system to prevent leaks, blockages and water ingress.
£17.50 — Fire Risk Assessment
0.6% | Total £1,400
Annual Fire Risk Assessment identifying legal non-compliances and required actions across the estate.
£12.50 — Fire Safety Signage (FRA requirement)
0.4% | Total £1,000
Installation and replacement of statutory fire-safety signage required by the FRA.
£12.50 — Fire Equipment and Safety Repairs Contingency
0.4% | Total £1,000
Allowance for unforeseen fire-safety related repairs and minor compliance works identified during the year.
£12.50 — Electrical Condition Report
0.4% | Total £1,000
Periodic statutory inspection and testing of communal electrical systems.
£12.50 — Pest Control
0.4% | Total £1,000
Scheduled and reactive pest-control treatments in communal areas.
£12.00 — Out-of-Hours Emergency Assistance
0.4% | Total £960
Access to emergency call-out support for urgent building issues outside normal working hours.
£6.25 — TV Equipment Maintenance
0.2% | Total £500
Maintenance of the communal aerial and TV distribution system.
£2.88 — Directors and Officers Insurance
0.1% | Total £230
Management liability insurance protecting RTM directors when making decisions on behalf of the company.
£1.38 — Health and Safety Monitoring Software
0.05% | Total £110
Online system used by Westbury
£12.93 — Accountancy Fees
0.4 % | Total £1,034
Schedule B / Flats 624-634 Barking Road
Leaseholders: 6 / Total Budget: £17,048.00
£541.33 — Water (Supply and Waste)
19.1 % | Total £3,248
Across June 2019 to August 2024 water use in the development has held consistently between 21 and 25 m³/day, with a long-term average of 23.4 m³/day. The recent measured period (4 Jul 2025 → 20 Aug 2025) shows a marked spike in usage to 29.57 m³/day, and has necessitated an increase in the water budget. We are looking into what has cause this spike. The water use is split across both building with the main building paying 93% and Barking road paying 7%
£500.00 — Cleaning
17.6% | Total £3,000
Weekly cleaning of internal hallways and stairwells every Thursday, including sweeping, vacuuming, dusting light fittings, wiping primary and fire doors, sanitising handrails, cleaning internal glazing, skirting boards and corners, and removing cobwebs. External walkways are cleared of leaves, debris and litter each week.
£466.67 — Insurance
16.4% | Total £2,800
Buildings insurance and associated cover for the Barking Road block.
£316.67 — Management services
11.1% | Total £1,900
Westbury Residential’s management fee covering contractor coordination, compliance oversight and day-to-day operations.
£166.67 — Door entry
5.9% | Total £1,000
Servicing and repairs to the access-control and intercom system.
£166.67 — Fire equipment maintenance and testing
5.9% | Total £1,000
Maintenance and statutory testing of extinguishers and communal fire equipment.
£166.67 — Electricity
5.9% | Total £1,000
Communal lighting and power for the Barking Road block.
£166.67 — Grounds maintenance
5.9% | Total £1,000
Upkeep of external planting, pruning, litter clearance and waste removal.
£106.00 — Reserve fund
3.7% | Total £636
Contribution towards future major works and unexpected costs.
£83.33 — Refuse and bin costs
2.9% | Total £500
Removal of bulky or contaminated waste that Newham Council will not collect.
£58.00 — Communal fire door inspections (quarterly)
1.5% | Total £348
Quarterly inspections required for buildings over 11.4m to ensure communal fire doors remain compliant.
£41.67 — Fire Risk Assessment
1.5% | Total £250
Annual FRA identifying any legal non-compliances and required actions.
£30.00 — Accountancy fees
1.1% | Total £180
Statutory accounts and service-charge accounting for Barking Road.
£19.00 — Fire door inspections (annual)
0.7% | Total £114
Annual inspection of flat entrance doors.
£12.00 — Out of hours assistance
0.4% | Total £72
Access to emergency call-out support outside normal working hours.
Service Charge C / Car Park - 60 flats between Spectacle Works and Barking Road
Leaseholders: 60 / Total Budget: £12,450
£100.00 — Reserve fund
40.1% | Total £5,000
Contribution towards future car-park works and major repairs.
£100.00 — Roller shutters
48.2% | Total £6,000
Annual servicing, repairs and operational maintenance of the roller-shutter system.
£16.67 — General building repairs and works
8.0% | Total £1,000
Repairs to car-park structure, lighting, surfaces and associated fixtures.
£7.50 — Engineering insurance
3.6% | Total £450
Statutory engineering cover required for inspection and certification of mechanical equipment.